Project status: Complete.
Service Provided: Principal Contractor (Traditional Contract)
A large 4 bedroom house was converted to a 5 bedroom house for the Assisted Living Sector. All bedrooms were en-suite wetrooms; one having a full anti-ligature bathroom suite installed. Electromagnetic door closers were installed throughout to aid wheelchair access.
Gallery